PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing rebar at the slab on grade Boiler-Electrical Room Facing West.jpg Laying out block at Stair -3 Facing West.jpg Waterproofing the shear wall at the South Elevation.jpg Block work at Stair -3 Facing North-West.jpg Installing electrical split wire above the ceiling at the 2nd floor Facing East.jpg Started installing Elevator Car 1,2,3.jpg Continued pressure testing the 2nd floor bathrooms Facing West.jpg Installed Electrical split wire above the ceiling at the 4th floor for the Emergency Night Lghting Facing East.jpg
Previous pageNext page Installing electrical split wire above the ceiling at the 2nd floor Facing East
Installing electrical split wire above the ceiling at the 2nd floor Facing East